Description
Advantages and features:
- One tubing run for setting and squeezing, easy operation, automatic closing after squeezing
- Open design for stinger and bridge plug, effectively prevent sand fouling blockage, eliminate switch failure
- Shorter design, suitable for shallow well and horizontal well
Application Processes:
- Temporary or permanent formation isolation
- Secondary cementing.
Parameters:
| O.D(mm) | Suitable Casing(mm) | Squeezing tool I.D.(mm) | Length(mm) | Rated pressure(MPa) | Rated Temperature(°C) | Release pressure(MPa) | Connection |
|---|---|---|---|---|---|---|---|
| 112 | 118-124 | 30 | 1110 | 70 | 120 | 18-20 | 2-7/8''EU |






