RETRIEVABLE BRIDGE PLUG

RETRIEVABLE BRIDGE PLUG 

Retrievable bridge plug is a kind of down-hole plugging tool used in oil field, mainly composed of a set mechanism, anchoring device, the sealing mechanism. Using a unique self-lock structure, has reliable two-way bearing function, without overlying the lime powder, can realize reliable sealing.

Retrievable bridge plug is delivered to suitable place via hydraulic tools to realize sealing, can be retrievable after unsealing, can be reused after replacing wearing parts. It can be used together with other downhole tools, for temporary plugging, selective plugging,etc. Retrievable bridge plug can be widely used in oil test, workover, test, reservoir transform and other construction, is a kind of safe and reliable, low cost, various function down-hole plugging tool

B. work principle

Connect retrievable bridge plug with the bottom of the hydraulic transportation tools ( cable sealing tool ),put downward bridge plug to designed depth, give pressure into the pipe column ( ignition ) with pump, bridge plug tension rods ( ring ) pull (shear)break, bridge plug realize seal, transportation tools with the pipe column are lift out of wellbore. When needed, use the special bridge plug fishing tools can lift the bridge plug out of the oil well.

C.Structure,assortment and main parameters
(一)Bridge plug assembly:Normal type and wall-built-in type

QSB type bridge plug,mandrel through,sealing force controlled by tension ring,can be used together with other downhole tools(other downhole tools can be connected to the bottom of bridge plug).

2.hydraulic transportation tools

3.Bridge plug fishing tools:


D.Tech characteristics

1. Seal type: Bridge plug was delivered to designed place and realize sealing via hydraulic pressure.
2.Accurate delivery control: the bridge plug seal force controlled by the tension rod, ensure that the bridge plug setting is safe and reliable, while ensuring the delivery tool can be safely lift out of the wellbore in complex cases.
3.Reliable anti-lock design: slip part adopts built-in slip structure, bridge plug is not easy to meet resistance when lift out, can be used safely at any angle inclined oil well.
4.Unique anchoring mechanism: the bridge plug connect slip, slip cone and outer cylinder perfectly, has good bidirectional bearing capacity, and can be applied to various levels of casing.
5.Safe unsealing mechanism: the bridge plug release sealing in the sequence of locking mechanism, sealing mechanism, slip mechanism level by level, regardless of whether the bridge plug on pressure balance, required releasing force is very small.
6.Has drillability: bridge plug has the advantages of compact structure, the locking mechanism is at the top of bridge plug, even when the bridge plug can not be removed due to abnormal reason, can conveniently drill clear.

E.Use instructions

(一)Well pipe(section need seal) requirements
1,Casing has no serious corrosion, damage or serious deformation;
2,Casing with serious scaling ( injection well), must be scrapped;
3,Bridge slip point must be over 2 meter away from casing coupling.
(二) Operation procedures
1.Well barrel preparation
1.1 Choose suitable hole gauge(hole gauge OD is bigger than Bridge plug OD by 2-3mm) to go through oil well,the hole gauge need go through smoothly.
1.2 For old oilwell produced or closed for long term ,should scrap the casing before sealing and plugging.
1.3Flush out dirt and dead oil.
2 .Tools preparation
Choose the right retrievable bridge plug and transport tools which match the use demand according to construction design,downhole temperature(max),work pressure difference(max),etc.

3. Connection of bridge plug assembly and transport tools.
3.1 Put one valve ball(φ19-21mm) into the mandrel on top of bridge plug(check have or not)
3.2Connect the bridge plug assembly and transport tool mandrel, rotate screw to end face of bridge plug assembly and transport tool by hand or pipe wrench, do not rotate hard with tong, in case break the bridge plug pin.
3.3Discharge two short pins from the “U ” type slot of delivery tool barrel ,fix with two long pin, to prevent the the buckle which connect bridge plug assembly and delivery loose.
3.4Connect hydraulic transport tool and tubing and seal them safely,wrap the connection thread with raw material belt to prevent back buckle.
3.5
Bridge plug bottom is connected by threads, can be connected with other downhole tools if needed.

4Use hydraulic transport tools to realize sealing
4.1.Connect bridge plug and transport tools correctly according to tech requirements
4.1.1The drilling speed was controlled within 50 tubing / hour, percussion and slide drilling is strictly prohibited.
4.1.2Drilling resistance no more than 30KN, otherwise move column to the normal hanging weight to continue drilling;
4.1.3Down to the sealing position, connect the ground pipeline, using cement truck to suppress to seal ( pressure according to the setting tool type ).Pressure slowly, static pressure to 6Mpa,pause for 5 minutes and then continue to pressure, when the pump pressure drop, annular overflow, then bridge plug has sealed;
4.1.4When dissection less than 3m, correct depth for pipe string before seal the bridge plug .
4.1.5Lift tubing by 3-5M,observing suspending weight changes, if the hanging weight is normal, down the tubing, weight not exceeding 50KN, verify the setting position of bridge plug;
4.1.6 Lift one joint of tubing ,install wellhead, do pressure test for the bridge plug according to the design requirement ( recommended pressure test value ≤20Mpa );
4.1.7After pressure test passed, lift pipe string and sealing tools.

5 Deblocking bridge blockage
5.1Choose matched bridge plug fishing tool according to bridge plug type .
5.2Connect tubing and bridge plug fishing tools properly
5.3Drill down at normal speed, when the fishing tool is 3-5m from the bridge plug surface, connect the ground pipeline, do well washing, sand washing, to ensure that the bridge plug surface have no sand and dirt;
5.4After sand washing, fish bridge plug while lowering pipe string, pressured weight controlled within 20-50KN, slowly lift a pipe column to normal suspension weight ( if meet resistance, then keep the net force 10-20KN,down the column, separate the fishing tool and bridge plug );
5.5Lifting pipe column by 4-5m, then lowering pipe string to the original block position of bridge plug, observe whether meet resistance, if pipe column no blocking, bridge plug sealing be released normally;
5.6Lift releasing pipe string, string rotation is strictly prohibited during lift drill string, in case the bridge plug falling into the well.

Leave a Reply

Your email address will not be published. Required fields are marked *

Subscribe To Free Industry Newsletters

Contact Us

Send Message

Contact Us

Completed This Form To Get Your Project Solution And Quote.