Seat squeezing integrated drillable bridge plug



A. Product use
It is suitable for the construction work of high-pressure extrusion injection of the lower layer.
B .Structure principle
Structure: It is composed of seat sealing tool, anchoring mechanism and sealing mechanism.
Seat sealing: when the oil pipe is pressurised to 8-10MPa, the start pin is sheared off, and the two-stage piston pushes the push cylinder downwards in turn, while making the upper cone, the kava, and the lower cone travel downwards, thus compressing the rubber cylinder. The tubing is pressurised to 18-20MPa, the seating seal is completed, and the drop hand pin is sheared off to achieve the drop hand. After the hand is thrown, the centre tube is pressurised to 25-30 MPa, and the slide pin is cut off, so that the centre tube is connected with the ground.



C.Technical parameters:
| outside diameter(mm) | Steel ball diameter(mm) | Tube I.D.(mm) | total length (mm) | Dropout Pressure(MPa) | working temperature(℃) | Start-up pressure(MPa) | be under pressure(MPa) | Seat Knocks Out Pressure(MPa) | Applicable inner diameter of casing(mm) |
|---|---|---|---|---|---|---|---|---|---|
| 114 | 25 | 30 | 1315 | 70 | 140 | 8-10 | 18-20 | 25-30 | 118-124 |
| 148 | 32 | 42 | 1410 | 70 | 120 | 10 | 14-16 | 28-30 | 152-166 |
Technical features:
1. The sealing and extrusion of the column can be completed in one go, with easy operation and small workload. After the extrusion operation, the lower part can be automatically closed.
2. The intubation is designed with an open design, and the bridge plug is also designed with an open design, effectively preventing sand and dirt from blocking and preventing the switch from malfunctioning.
3. After accidental sealing or thorough flushing of the well due to displacement, a specialized tool can be used to completely remove this tool



D. Operation method:
① Before entering the well, perform necessary scraping, well cleaning, and use a 118 gauge to ensure that the inner wall of the casing is unobstructed. At the same time, budget the sealing position and be sure to avoid the casing clamp.
② Connect the bridge plug to the 2 7/8 UP TBG thickened oil pipe, limit the speed to the design position, do not throw the ball, and wash the well with 1.5-2 times the capacity of the oil pipe for water accumulation.
③ Up to the sealing depth, lift the pipe column at 0.3m/1000m.
④ After throwing a 25mm ball for 15 minutes, apply pressure of 6-8-10-12-18-20MPa, stabilize for 3 minutes each, and successfully release the seat seal. Continue to pressurize to 25-30MPa and open the sliding sleeve.
⑤ Lower the pipe column, apply a pressure of 3-5T load, perform positive extrusion sealing, and proceed with extrusion blocking operation after passing the inspection.
If salvage is required, use specialized salvage tools.



E.Attention:
① This pipe column is not allowed to be connected to bypass tools externally.
② Seat sealing steel balls are not allowed to be pre-set, and the drilling speed must be strictly limited to prevent pressure caused by excessive drilling speed, which may cause them to be seated halfway.
③ The first job should be to wash the well to ensure that there is no sand scale or particulate matter in the well, in order to prevent sealing failure caused by sand scale and particulate matter blocking the sealing tool channel.
④ After the extrusion of the lower end of the bridge plug is completed, if it is necessary to extrude the upper end, it must wait for the cement at the lower end to solidify before extruding the upper end of the bridge plug.